Design, delivery and assembly of system for automated control of level
in TPP “ENEL Maritsa East” 3”
- a
- a
- DATE
- 2006
- PROJECT ACCEPTED BY
- Ulrich Ostheeren
Design, delivery and assembly of system for automated control of level in pump stations’ drain shaft, delivering water for flow-gas desulphurisation installation – 12 in TPP “ENEL Maritsa East” 3
CONTRACTOR
TPP “ENEL Maritsa East” 3”
DATE
2006
PROJECT ACCEPTED BY
Ulrich Ostheeren
CONTRACTORS’ EVALUATION
The project is completed according to the assignment without any remarks.
- CONTRACTORS' EVALUATION
- The project is completed according to the assignment without any remarks.