Complete electrical assembly of system for control
of Transport crawler G98000 – V 8129”
- CONTRACTOR
- Sandwik
- DATE
- march 2008
- PROJECT ACCEPTED BY
- eng. Sabin Spahiev, Kristian Popovich
The project includes assembly of cable trace, laying of control and communication cables, assembly and connection of gauges, control of the insulation of the core on all cables, making of cable separators and preparation of the cores for connection, assembly of cable glands and connection of the cables according to the project.
CONTRACTOR
Sandwik
DATE
march 2008
PROJECT ACCEPTED BY
eng. Sabin Spahiev, Kristian Popovich
CONTRACTORS’ EVALUATION
The project is completed according to the assignment without any remarks.
- CONTRACTORS' EVALUATION
- The project is completed according to the assignment without any remarks.