Complete electrical assembly of system for control

Title:

Description:

Complete electrical assembly of system for control

of Transport crawler G98000 – V 8129”
CONTRACTOR
Sandwik
DATE
march 2008
PROJECT ACCEPTED BY
eng. Sabin Spahiev, Kristian Popovich
project10.png

The project includes assembly of cable trace, laying of control and communication cables, assembly and connection of gauges, control of the insulation of the core on all cables, making of cable separators and preparation of the cores for connection, assembly of cable glands and connection of the cables according to the project.

CONTRACTOR
Sandwik
DATE
march 2008
PROJECT ACCEPTED BY
eng. Sabin Spahiev, Kristian Popovich
CONTRACTORS’ EVALUATION
The project is completed according to the assignment without any remarks.
CONTRACTORS' EVALUATION
The project is completed according to the assignment without any remarks.
RADNEVO

Production facility

+359 417 8-28-58

nakra@nakra.eu

nakrabg@gmail.com

RADNEVO, BULGARIA

28 Mitio Stanev str.


CONTACT US


+ 359 887 336 336+ 359 887 41 51 08

Copyright ©2020 all rights reserved